As of March 20224Urayama Dam (1997)Located in Chichibu City, Saitama Prefecture, this is Japan’s second-highest gravity dam. Utilizing the world longest layer construction method, the RCD method, the world’s first one-meter lift, and belt conveyor technologies to transport raw stone, aggregate, and concrete materials for the first time in Japan, this challenging project applied several unprecedented technologies. The dam is now a familiar site open to the public.Shizuoka Prefectural Fuji Swimming Pools (2001)With an external profile that recalls a giant waterdrop, this building contains swimming pools equipped with movable floors and walls that change depths and distances. The facility is open to the public, including children, adults, and the elderly, as a fully equipped sports center. In 2003, it served as the main venue for the Summer National Sports Festival held in Shizuoka Prefecture.2003Celebrated 120th anniversary of the Company’s founding.Surikamigawa Dam (2006)This rock-filled dam with center core, one of the largest in the Tohoku region, supplies city water, including drinking water and water for other everyday uses to three cities and four towns, including Fukushima City. It also provides irrigation for rice paddies and agricultural land along the Surikami River and Abukuma River to support the thriving agriculture of this region.2013Celebrated 130th anniversary of the Company’s founding.Wacoal New Kyoto Building (2016)Designed to serve as a new marketing base, the building with its external fins and other design features expresses tact, gentleness, refinement, and purity. Incorporating a toggle brace seismic damping structure, the building attained S rank class, signifying Superior quality by CASBEE.National Highway No. 45, Rikuzentakata Road (2018)This 10 km limited highway was planned as a leading earthquake disaster reconstruction project. We constructed the 7.0 km section on the side of Rikuzentakata. Completion of the road will strongly help afflicted areas move local reconstruction and is expected to play a major role in the development of local industries encompassing Iwate and Miyagi Prefectures.2019Formulated Medium-Term Five-Year Plan with the basic policy of establishing foundations for our status as a New Business Contractor.forward with Mega Solar Park (2020)To make the most of renewable energy and to achieve carbon neutrality, we installed 122,000 solar panels on a vast 65 ha site developed as part of a mega solar power plant project with an output power of 45 MW in Miyagi Prefecture.Elevated Bridge for the Hokuriku Shinkansen Nanetsu Station (2021)We constructed a 980-meter elevated bridge with Echizen-Takefu Station positioned in the middle as part of the Hokuriku Shinkansen extension project from Kanazawa to Tsuruga. The bridge is scheduled to be opened at the end of FY 2023. We are also currently engaged in separate construction work to build Echizen-Takefu Station.billion yenbillion yenbillion yenPercentage of sales:Percentage of sales:Percentage of sales:Civil Engineering and Construction BusinessNet sales60.1Building Construction BusinessNet sales44.4GrowthBusinessNet sales13.2DevelopmentPeriod(1960-1990)TransformationPeriod(1991-2010)Co-creationPeriod(2011-)51.1%37.7%11.2%
元のページ ../index.html#5